Free Estimate 📞 (877) 586-1316 24/7
โ˜…โ˜…โ˜…โ˜…โ˜… 5 Stars ยท 416+ Reviews

Our Roofing Services | Gray, GA

Same-Day Appointments Available  ยท  24/7 Emergency Service

Gray Roofing & Maintenance in Gray, GA โ€” Professional Roofing services. Call (877) 586-1316.

Call (877) 586-1316
📞 (877) 586-1316
Same-Day Service Licensed & Insured Free Estimates
<60 Min
Response Time
16+
Years Experience
5
Star Rating
416+
Happy Reviews

Our Roofing Services | Gray, GA

Everything we do is roofing. That focus means our Gray crews install more roofs per year than companies that try to do siding, windows, and remodeling on the side.

roof replacement

Roof Replacement

The average roof replacement in Gray takes one day for a standard residential home. Larger or steeper roofs might take two. Either way, we don't leave a house uncovered overnight. If we tear it off, we cover it before we leave. No exceptions.

Get a Free Quote โ†’
roof repair

Roof Repair

Improper step flashing is the leading cause of roof leaks at wall-to-roof transitions. Step flashing needs to be woven between shingle courses with each piece extending 4" above the shingle exposure. We see Gray homes where the last roofer used continuous L-flashing or just caulked the gap. That always fails. We tear it out and install proper step flashing with a kick-out diverter at the bottom per IRC R905.2.8.3.

Get a Free Quote โ†’
storm damage repair

Storm Damage Repair

Not all storm damage qualifies for a full replacement. Hail might only damage one slope. Wind might only lift shingles on the windward side. We document exactly what's damaged and let the insurance company make the call. Honest documentation gets claims approved. Inflated claims get denied.

Get a Free Quote โ†’
new roof installation

New Roof Installation

Proper ventilation is the most overlooked element in new roof installation. We calculate intake and exhaust per IRC R806 based on attic square footage. Balanced ventilation. Soffit intake matched to ridge exhaust. Keeps your attic cooler in summer and drier in winter. That extends roof life and cuts your energy bill.

Get a Free Quote โ†’
metal roofing

Metal Roofing

We install 24-gauge and 26-gauge steel standing seam panels in Galvalume and pre-painted finishes. Concealed fastener clips allow the panels to expand and contract with temperature changes without stress on the fasteners. That's why standing seam doesn't leak. The clips float.

Get a Free Quote โ†’
shingle roofing

Shingle Roofing

Architectural shingles are what we install on 90% of Gray homes. They're thicker, heavier, and more wind-resistant than the old 3-tab flat shingles. They also look dramatically better. Dimensional profiles that mimic wood shake or slate. Standard architectural shingles carry a 30-year warranty. Premium versions go to 50.

Get a Free Quote โ†’
flat roofing

Flat Roofing

The number one cause of flat roof failure is ponding water. Standing water that doesn't drain within 48 hours after rain. We solve ponding by installing tapered insulation systems that create positive slope to drains, scuppers, or roof edges. Minimum 1/4" per foot of slope eliminates standing water.

Get a Free Quote โ†’
commercial roofing

Commercial Roofing

Need a commercial roof coating? Silicone coatings over existing TPO, EPDM, or metal extend life 10-15 years for a third of replacement cost. Not every roof qualifies. The existing membrane needs to be in decent shape. We core sample and moisture scan to verify before we recommend it.

Get a Free Quote โ†’
gutter installation

Gutter Installation

Clogged gutters cause fascia rot, soffit damage, and foundation erosion from concentrated water runoff. That's not a marketing scare tactic. We see the damage on every other gutter replacement in Gray. Properly sized gutters with adequate downspout capacity move water away from the house. We calculate capacity using rainfall intensity data for Gray: roof area x pitch factor x rainfall rate in inches per hour. Standard 5" K-style handles 5,520 square feet of effective roof area.

Get a Free Quote โ†’
roof inspection

Roof Inspection

We don't inspect roofs from the ground with binoculars. We get on the roof. Every inspection includes a full walkthrough: shingle condition, flashing integrity, pipe boots, ridge vent, soffit ventilation, gutter function, and visible attic moisture signs. You get photos and a written report.

Get a Free Quote โ†’
emergency roof repair

Emergency Roof Repair

Emergency tarping is step one. Stop the water. We secure heavy-duty poly tarps over the damaged area using 2x4 nailer boards attached to the deck. Once the immediate threat is contained, we schedule the permanent repair within 48-72 hours.

Get a Free Quote โ†’
skylight installation

Skylight Installation

VELUX FS (fixed) and VS (vented) skylights installed with EDL flashing kits for shingle roofs. The multi-step flashing integrates with the surrounding shingle courses per IRC R903.2. We frame the curb with doubled 2x8 or 2x10 lumber (depending on rafter depth), install ice and water shield membrane around the entire curb perimeter, then set the skylight with factory sealant before weaving step flashing into the field. Top headwall flashing tucks under the upslope shingle course. Bottom sill pan diverts water onto the downslope shingles. Zero exposed sealant joints. Mechanical flashing only.

Get a Free Quote โ†’

SAME-DAY APPOINTMENTS AVAILABLE

Get Your Free Roof Inspection Today

24/7 emergency service. Most appointments available within 48 hours.

📞 Call (877) 586-1316

โ˜…โ˜…โ˜…โ˜…โ˜… 5/5 from 416+ Reviews  ยท  Licensed  ยท  Insured